opc_loader

Menu

REV04499 SIKORSKY CH-53 G

Item No.: REV04499
23,34

Sold Out

  • Pick up at a collection point possible
  • Ordered before 3 p.m. shipped the same day
Description

In 1966 the German military evaluated both the CH-53 and CH-47 as a replacement for the H-21 and H-34G helicopters with an initial requirement for 133. The purchase of the CH-53 was approved in June 1968 but due to budget constraints only 110 were ordered. Following the delivery in 1969 of two pre-production helicopters from Sikorsky the production aircraft were licence built by VFW-Fokker at Speyer in Germany. The first German-built helicopter flew from Speyer on 11 October 1971 and was delivered to the EST-61 flight test centre at Manching on 1 December 1971. 

Twee uitvoeringen mogelijk;

  • Duitse Luftwaffe; HEER 85#38.
  • Duitse Luftwaffe; HEER 84#11.

Aantal onderdelen; 116 stuks.
Afmetingen;

 

 

 

 

 

  • Lang; 305 mm.
  • rotordiameter; 304 mm.

 

 

 

Reviews ()
REV04499 SIKORSKY CH-53 G does not have any reviews yet. Share your experiences and post a review.
Post review
REV04499 SIKORSKY CH-53 G
Post review

Meest recente reviews

Last viewed items